Commercial battery storage: sizing, grid connection and fire safety

One local tradesperson gets your request – no ring-round.

Your request: Home battery storage

Step 1 of 5 · Project

Grants may apply – the business takes them into account in the quote.

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
Is there already a solar PV system? (required)
kWp
kWh
Desired storage capacity (required)
Should the battery keep power on during outages? (required)
When should the work start? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

A business battery is bought for different reasons than a home battery: to cut peak demand, to use more of a large rooftop solar array, to keep critical equipment running, or to avoid upgrading the grid connection for new chargers or machinery. The project is larger, the paperwork heavier and the fire safety duties sit with you as the business. This page is for companies, farms and public buildings planning storage. Your request goes to one supplier only.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

Start with half-hourly data

Business electricity is usually metered half-hourly, and that data is the basis of any serious proposal. It shows when demand peaks, how often, and how much of it a battery could shift. Ask your supplier or meter operator for at least a year of it before inviting proposals. A supplier that sizes a commercial battery without it is guessing.

The same data shows whether storage is the right tool at all. Sometimes shifting a process, staggering start-up of machinery or changing the tariff saves more than a battery would.

What a business battery can do

  • reduce peak demand so the site stays within its agreed grid capacity
  • store rooftop solar generated at weekends or lunchtimes for use when the site is busy
  • support electric vehicle charging without a larger grid connection
  • keep critical loads such as refrigeration, servers or alarms running during an outage
  • earn income from flexibility services, where a site and its supplier are eligible
Make a request

Grid connection and approvals

Any battery that can export, or that is large enough to affect the local network, needs the distribution network operator's approval before it is connected. For larger systems the study can take months and may result in an export limit or a requirement for protection equipment. Ask each supplier to state who submits the application, when, and what happens to the programme if the answer comes back with conditions.

Containerised or outdoor systems may also need planning permission, especially near homes or in protected areas. The supplier should tell you early whether it expects an application and who prepares it.

Fire safety is your duty as well as the supplier's

In England and Wales, the Regulatory Reform (Fire Safety) Order 2005 makes the responsible person for business premises accountable for fire risk. A large lithium battery changes that risk, so the fire risk assessment has to be reviewed before installation, not afterwards. Location, separation from escape routes and other buildings, detection, ventilation and access for the fire service all belong in the design.

Tell your insurer before you order. Insurers increasingly ask for specific information about battery chemistry, location and monitoring, and an uninsurable installation is an expensive surprise.

Source: legislation.gov.uk

What the proposal should state

  • the load data used and the modelled savings, month by month
  • usable capacity, power rating and expected degradation over the warranty
  • the connection application and any assumed export limit
  • fire safety design, including the standards followed
  • monitoring, remote support and response times for faults
  • maintenance obligations and what voids the warranty
  • decommissioning and recycling at end of life

VAT and finance

The zero rate for batteries under the energy-saving materials rules applies to installations in homes and certain residential or charitable buildings. For ordinary business premises, assume standard-rated VAT and ask your accountant how it and any capital allowances apply to your organisation.

Some suppliers offer the battery as a service or under a shared-savings contract. Read how savings are measured and what happens if your usage changes, because that determines what you actually pay.

One supplier sees your request

Describe the site, the reason for storage and any existing solar. The request is offered anonymously to storage suppliers covering your region, and exactly one can buy it. We email you its company name, address and phone number before it receives your details. The service is free for you, and nothing obliges you to accept a proposal.

Grants in the United Kingdom

These schemes may apply to your project. What counts are the provider's conditions at the time you apply.

  • 0 % VAT on energy-saving materials (VAT Notice 708/6)

    HM Revenue & Customs

    The installation of energy-saving materials in homes – including insulation, draught stripping, heating controls, solar panels, air, ground and water source heat pumps and batteries – is zero-rated for VAT until 31 March 2027, after which the reduced rate of 5% applies. Windows and glazing are standard-rated.

    Source: www.gov.uk · As of 09.2026

Services

Related services

Frequently asked questions

Is a battery worth it without solar panels on the roof?

For some sites, yes: where peak demand or a grid capacity limit drives the cost, or where critical loads need backup. Your half-hourly data shows whether that applies.

How long does a commercial battery project take?

The installation itself can be quick. The network application, any planning consent and equipment lead times usually decide the programme, so ask each supplier for a realistic timeline with those steps shown.

Do we need to update our fire risk assessment?

Yes. A battery is a significant change to the premises, and the responsible person should review the fire risk assessment before installation. Your insurer will usually want to know as well.

Can a battery replace our backup generator?

For short outages and moderate loads it can. For long outages or very large loads, a generator or a combination of both is often still needed. The proposal should state how long the battery can support your critical loads.