Pulling down a building is fast; the paperwork and preparation before it are not. In England and Wales most demolitions need a notice to the council's Building Control, many need a decision from the planning department, and almost any older building needs an asbestos survey first. Tell us what has to come down. Your request goes, without your name, to demolition contractors who work in your area, and one of them can take it on.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
Planning: permitted development and prior approval
In England, demolishing a building is often permitted development, but with a condition. Before starting, the developer must ask the local planning authority to decide whether it wants to approve the method of demolition and how the site will be restored. The application includes a description of the work and confirmation that a site notice has been put up.
No separate application is needed where the demolition is part of a planning permission for redeveloping the site, which is the usual case when a house is knocked down to build a new one. Other cases need full permission or special consent: buildings in a conservation area, listed buildings, pubs, theatres and live music venues, and buildings left to become unsafe when they could have been repaired.
Permission to demolish does not mean permission to rebuild. If you plan a replacement house, get that permission first. Wales, Scotland and Northern Ireland have their own rules, so check with your council.
The demolition notice under the Building Act
Section 80 of the Building Act 1984 requires notice to the local authority before demolishing all or part of a building in England and Wales. Exceptions include small buildings of no more than 1,750 cubic feet measured externally, certain greenhouses, conservatories, sheds and prefabricated garages, and internal demolition in a building that stays occupied.
The person giving notice must send copies to the occupiers of adjoining buildings and to the gas and electricity suppliers. The council then has six weeks to respond with a notice setting conditions, for example on shoring up neighbouring buildings, protecting the public, disconnecting services, removing rubble and making good the site. Work cannot start until the council has served its notice or that period has passed. A competent contractor handles this for you, but the responsibility is yours if nobody does.
Source: planningportal.co.uk
Make a requestAsbestos must be found before anything is broken
The Health and Safety Executive tells owners to assume asbestos is present in any building built or refurbished before 2000. The law requires asbestos-containing materials to be removed, as far as reasonably practicable, before major refurbishment or demolition.
That is the job of a refurbishment and demolition survey by a competent surveyor. It is intrusive, lifting floors and opening walls, so the building must be empty. Some asbestos can only be removed by a contractor licensed by the HSE. Ask the demolition contractor who will do the survey and who removes what it finds, and make sure the price does not assume there is none.
Source: hse.gov.uk
Safety, services and the neighbours
Demolition falls under the Construction (Design and Management) Regulations 2015. On a domestic job the client's duties normally pass to the contractor, who needs a construction phase plan before starting. Gas, electricity, water and telecoms connections must be cut off and capped by the network operators, which can take weeks to book, so start early.
On a semi-detached or terraced house, taking down your half exposes the neighbour's party wall to weather and may need support. The Party Wall etc. Act 1996 applies in England and Wales, and the neighbour can appoint a surveyor. Expect questions about dust, noise, working hours and lorry access, and check whether a skip or scaffold on the road needs a licence from the council.
Source: legislation.gov.uk · legislation.gov.uk
What drives the price
Two buildings with the same floor area can cost very different amounts to demolish. The quote should make clear what it includes.
- size, construction (brick, timber, steel, concrete) and number of storeys
- asbestos survey and removal, and any other hazardous waste
- access for machines and lorries, and space to work on the site
- whether foundations, slabs and drains are removed or left
- separation and recycling of waste, and landfill costs
- protection of neighbouring buildings and trees
- who prepares notices and applications
Sent to one demolition firm only
You confirm your phone number and email, and we offer a summary of the job, without your name or contact details, to demolition companies in your area. One company can buy it and pays Offrano for it; you pay nothing. We email you the contractor's name, address and phone number before it sees your details.
No contractor has to buy it, and requests that are not taken are withdrawn after 21 days. You are free to get other quotes and to turn down this one. Offrano verifies that buyers are registered businesses but does not assess their work, so ask for public liability insurance, the waste carrier registration and, where asbestos is involved, the licence details.
Frequently asked questions
Do I need permission to demolish my house?
In England you usually have to apply to the council for a decision on prior approval of the method of demolition and the restoration of the site, unless the demolition is part of a planning permission to redevelop. Conservation areas and listed buildings need specific consent. You also have to give the Building Act notice to Building Control.
Do I need to notify the council to demolish a garage?
Not always. The Building Act notice does not apply to very small buildings of no more than 1,750 cubic feet, measured externally, nor to certain sheds and prefabricated garages. A garage attached to your house or a neighbour's may be different, so ask Building Control.
How long must I wait after giving the demolition notice?
The council has six weeks to serve a notice setting conditions. You can start when it has served that notice or when the six weeks have passed without one.
Source: legislation.gov.uk
Is an asbestos survey required for a house demolition?
For any building built or refurbished before 2000, asbestos should be assumed, and it must be found and removed as far as reasonably practicable before demolition. A refurbishment and demolition survey by a competent surveyor is the way to do that.
Source: hse.gov.uk
Can I take down an outbuilding myself?
Small structures often can be removed by the owner, but not if they may contain asbestos, such as old cement roof sheets, or if they are attached to another building. The risk is not the demolition itself but disturbing materials you cannot see.
What happens after a demolition firm buys my request?
We email you its name, address and phone number, and only then does it receive your details to contact you. The request is sold to that single firm and no other.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request