Skip to content
Offrano
Choose country and language:

Electrician

Electrical installation: new sockets, lights and circuits

One local tradesperson gets your request – no ring-round.

Your request: Electrician

Step 1 of 5 · Project

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
Year the building was built (required)
What do you need? (required)
m²
How urgent is it? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

Most electrical requests are additions to a working installation: more sockets in a home office, new lighting in a kitchen, power to a garden room, the wiring for an extension. None of this replaces the old wiring, which is a rewire, and none of it involves swapping the fuse board, which is a separate job. This page covers the planning of new electrical work, what the Building Regulations say about it and how to describe it so the quote matches what you want. The request is bought by exactly one electrical firm.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

Adding to a circuit or running a new one

A few extra sockets can often be added to an existing circuit, if that circuit is in good condition and has capacity for more load. The electrician tests it before extending it. If the circuit already serves a kitchen full of appliances, or the tests show a fault, a new circuit from the consumer unit is the better option.

New circuits are needed for larger loads such as an electric cooker, an electric shower, an outbuilding or an EV charger, and often for a new extension or a converted loft. A new circuit is notifiable work under Part P in England and Wales. An electrician registered with a competent person scheme self-certifies it; otherwise Building Control must be involved before the work starts.

Whether a new circuit is possible also depends on the consumer unit. If it has no spare ways or no suitable protection, the electrician may recommend replacing it first.

Kitchens, bathrooms and outdoors

Rooms with a bath or shower are special locations in the wiring regulations, divided into zones around the water. What may be installed, and with what protection, depends on the zone, which is why a shaver socket may be allowed where an ordinary socket is not. Altering circuits in these rooms is notifiable in England. In Wales, kitchens and outdoor installations are also treated as special locations.

Outdoor sockets, garden lighting and power to a shed or garden office need weatherproof equipment, protection by residual current devices and cable that is protected against damage, usually armoured cable buried at a suitable depth or run along a wall. A supply to an outbuilding also raises the question of earthing, which depends on your supply type. It is not a job for a spare evening with an extension lead.

Make a request

First fix and second fix

In an extension or a renovation, electrical work happens twice. First fix runs cables and fixes back boxes while walls and ceilings are open, before plastering. Second fix fits the sockets, switches and fittings once decorating is nearly done. Between the two, the plasterer, kitchen fitter and builder need to know where everything goes.

Walk round with the electrician before first fix and mark socket heights, switch positions, the television wall, outside lights and where the kitchen appliances will stand. Moving a socket after plastering means chasing the wall again. For lighting, decide early on dimmers, two-way switching and whether you want downlights, which need fire-rated fittings or covers where they go into ceilings that form a fire barrier.

Describe the job properly

  • a list of rooms with the number and type of sockets, switches and fittings wanted
  • a sketch or photos showing positions, and whether walls are solid or stud
  • the age of the existing wiring and consumer unit, with a photo of the consumer unit
  • for outbuildings: distance from the house and the route the cable could take
  • for extensions: drawings, and the builder's programme for first and second fix
  • who supplies light fittings and switches, you or the electrician

Mistakes that cost money later

Adding socket after socket to an old circuit without testing it; buying fittings online that are not rated for bathrooms or outdoor use; not planning enough sockets and relying on extension leads; and skipping the certificate. After new work you should receive an Electrical Installation Certificate or Minor Works Certificate, and for notifiable work the Building Regulations compliance certificate. A buyer's solicitor will ask for them.

Where your request goes

Once you have confirmed your mobile number by code and your email by link, electricians in your area see the job without your name or contact details. One firm can buy it, and then it is removed from sale. The electrician pays Offrano; for you the service is free.

Before the firm sees your details, you get its name, address and phone number by email. If nobody buys the request within 21 days, it is withdrawn, and you can always ask other electricians yourself. Offrano only checks that buyers are registered businesses; check competent person scheme registration on the official register before notifiable work starts.

Services

Related services

Guides on Electrician

Frequently asked questions

Does adding a socket need Building Regulations approval?

Usually not, if it is an addition to an existing circuit outside a bathroom in England. A new circuit, work in a room with a bath or shower, and in Wales work in kitchens and outdoors, is notifiable and needs a registered electrician or Building Control.

Can a garden office run off an extension lead?

Not safely as a permanent arrangement. A garden office needs a proper supply: a new circuit with suitable cable, protection and earthing, usually with its own small consumer unit in the building. That is notifiable work.

What is first fix and second fix?

First fix is running cables and fixing boxes before plastering. Second fix is fitting sockets, switches and lights after decorating. Positions are fixed at first fix, so decide them before the plasterer arrives.

Do I need a new consumer unit to add a circuit?

Not always. If the existing unit has a spare way and suitable protection, the circuit can be added. Older units without residual current devices, or full ones, often need replacing first.

Which certificate should I get for a few new sockets?

A Minor Electrical Installation Works Certificate for an addition to an existing circuit, or an Electrical Installation Certificate for a new circuit. For notifiable work, the Building Regulations compliance certificate follows from the electrician's scheme.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides