Fitted kitchen
Kitchen fitting for a kitchen you have already bought
One local tradesperson gets your request – no ring-round.
✓ Confirm
Almost done: please confirm your email address.
We have sent an email to {email}. We only release your request to businesses once you have clicked the link in it.
Many people buy their units from a retailer or online and then hire a fitter separately. It can save money and gives you a wider choice of kitchen, but it splits responsibility: the supplier answers for the goods, the fitter for the workmanship, and a gap between the two is where most disputes start. This page explains what a kitchen fitter does and does not do, what to prepare before the first day, and how to avoid paying twice for the same mistake. Your request goes to exactly one fitter in your area.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
What fitting usually includes and what it does not
A fitter's price normally covers assembling flat-pack carcasses where needed, fixing base and wall units level and square, fitting doors, drawers, handles, plinths and cornice, cutting and fixing laminate or timber worktops, fitting the sink and integrated appliances into their housings, and adjusting everything at the end.
Other work is often excluded unless you ask for it: stripping out the old kitchen and taking it away, moving plumbing or waste, electrical work, gas connections, plastering, tiling, flooring and decorating. Stone or quartz worktops are usually templated and fitted by the worktop maker, not by the fitter. Get a written list of inclusions so you know which other trades you need and in what order.
- strip-out and disposal of the old kitchen
- assembly of flat-pack units, if they are not rigid
- worktop cutting, jointing and sealing, including sink and hob cut-outs
- plumbing of sink, dishwasher and washing machine
- who does the electrical work and who connects any gas appliance
- tiling, flooring and making good after removal of the old units
- the day rate or fixed price for extra work
Before the fitter arrives
Check every box on delivery against the order, before the fitter's first day, and report shortages and damage to the supplier straight away. A fitter who finds a missing corner unit on day two may have to leave and return, and that lost time is often charged to you.
Give the fitter the full drawings, appliance manuals and the manufacturer's fitting instructions. Make sure the room is ready: old units out if you are doing that yourself, first-fix plumbing and electrics done, walls plastered and dry, and the floor finished if it runs under the units.
Make a requestTrades the fitter should not cover alone
Only an engineer on the Gas Safe Register, qualified for cookers and hobs, may disconnect or connect a gas appliance in someone's home when employed to do so. Ask whether your fitter holds that registration or will bring in someone who does, and check the engineer's card on the day.
Electrical work in a kitchen is not in a special location, but a new circuit, such as one for an induction hob or oven, and a new consumer unit are notifiable in England. Fitting a built-in oven on an existing cooker circuit is not. Adding sockets to an existing circuit outside a special location is also not notifiable, but it must still be done safely and tested. You should receive a certificate for notifiable work from a registered electrician, or Building Control sign-off.
Who is liable if something is wrong
Under the Consumer Rights Act 2015, the supplier is responsible for goods that are faulty or not as described, and the fitter for carrying out the work with reasonable care and skill. If a door warps, that is usually a goods problem; if the doors do not line up because the carcasses were fixed out of level, that is workmanship. Photographs of deliveries and of the work at each stage make these conversations easier.
Agree how payment is staged. A deposit, a payment when units and worktops are in, and the balance after snagging is common. Avoid paying the full fitting price up front.
Source: legislation.gov.uk
Common fitting mistakes
Wall units hung on plasterboard with the wrong fixings, worktop joints not sealed, cut edges around the sink left bare, appliance ventilation gaps blocked by plinths, and integrated dishwashers left unfixed to the worktop are all mistakes that show up months later. Ask the fitter how they fix to your wall type and how they seal worktop cut-outs.
How the request is passed on
Tell us what you have bought, whether it is flat-pack or rigid, what the fitter should cover and when delivery is due. Once you confirm your phone number and email, kitchen fitters in your area see the job without your contact details, and exactly one can buy it. It is then removed from the list. We email you the fitter's name, address and phone number before your details are shared. It costs you nothing, there is no guarantee a fitter takes it, and unsold requests are withdrawn after 21 days. Offrano confirms that the buyer is a registered business, nothing more.
What does it cost?
Which? estimates, in its kitchen cost guide updated April 2026, that labour makes up approximately 20-30% of the final spend on a kitchen renovation if you do none of the installation yourself.
Source: www.which.co.uk
- Make a request
Frequently asked questions
Can a kitchen fitter connect my gas hob?
Only if they are Gas Safe registered and competent for cookers and hobs. Many fitters use a separate Gas Safe engineer for that connection. Check the engineer's ID card for the right category.
Who checks the delivery, me or the fitter?
Agree this in advance. If you bought the kitchen, you usually deal with the supplier, so check the delivery against the order as soon as it arrives and report problems before the fit starts.
Does the fitter take away the old kitchen?
Some do, some charge extra and some do not at all. Ask whether strip-out and disposal are included, and whether a skip is needed on the road, which may require a council permit.
What if a unit is damaged during fitting?
If the fitter damages it, it is usually their responsibility to pay for a replacement. If it arrived damaged, it is a matter for the supplier. That is why checking deliveries before the fit is so useful.
Will I hear from several fitters?
No. One fitter buys the request and it then comes off our list. You can still find other fitters yourself.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request