Skip to content
Offrano
Choose country and language:

Drywall and partitions

Plasterboard partitions, ceilings and loft conversions

One local tradesperson gets your request – no ring-round.

Your request: Drywall and partitions

Step 1 of 5 · Project

Project

What exactly is it about? (required)
What type of building is it? (required)
What work is needed? (required)
m²
Including insulation? (required)
When should the work start? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

In the UK the trade is usually called dry lining or partitioning rather than drywall: timber or metal studs, clad in plasterboard and finished with a skim coat or taped joints. It is how most new internal walls, office partitions and suspended ceilings are built, and it is at the heart of most loft conversions. The work looks light, but it often changes how a building resists fire and noise and how people get out in an emergency. This page explains what is involved and which rules apply. Your request is passed to exactly one business in your area.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

Partition walls: splitting and reshaping rooms

A stud partition can divide a large bedroom in two, create a walk-in wardrobe or an en suite, or separate a home office. Metal studs are standard in commercial fit-outs, timber is still common in houses. The specification decides how the wall performs: the board type and thickness, the number of layers, and whether the cavity is filled with mineral wool for sound.

Moving walls affects more than the layout. A new bedroom created by a partition still needs a window or ventilation, and in a house with a loft room or three storeys the escape route matters. Taking a wall out is a different job altogether. Before any existing wall is removed, someone competent needs to confirm whether it is load-bearing; if it is, you need structural calculations, usually a steel or timber beam, and Building Regulations approval.

Suspended ceilings and fit-outs for businesses

Suspended ceilings hide services in offices, shops and clinics and give access to them through removable tiles. In commercial buildings the ceiling and partitions are often part of the fire strategy, so the fit-out has to keep fire compartments and cavity barriers intact and keep fire-stopping around every cable and duct that passes through. Tell the contractor if the premises are leased; landlords usually require approval of the design and the contractor's insurance and method statements before work starts.

For a business buyer, a good specification names the board system and its tested performance, not just the wall thickness. Ask for the manufacturer's system reference so that what gets built matches what was tested.

Make a request

Sound and fire upgrades

Noise between rooms or between a house and its neighbour is one of the most common reasons people ask for extra layers of board, resilient bars, independent linings or acoustic insulation. Results depend heavily on detailing: a gap at the ceiling or a back-to-back socket box can undo much of the benefit.

Where a building is converted into flats, sound insulation between the new dwellings has to meet Part E of the Building Regulations in England, and fire separation has to meet Part B. That is design and Building Control work, not something to improvise with an extra sheet of plasterboard.

Loft conversions: permission and Building Regulations

In England, many loft conversions on houses are permitted development and need no planning application. The Planning Portal sets the conditions: the added roof space must not exceed 40 cubic metres for terraced houses or 50 cubic metres for other houses, including any earlier roof extensions; it must not go higher than the existing roof; dormers must not extend beyond the roof slope on the principal elevation facing a highway; materials must look similar to the house; and side-facing windows must be obscure-glazed. Flats and maisonettes have no such rights, and neither do houses in conservation areas, National Parks and other designated land. Wales, Scotland and Northern Ireland have their own rules.

Building Regulations approval is required to turn a loft into a liveable room, whatever the planning position. Building Control looks at the strength of the new floor, the stability of the roof once rafters and ties are altered, safe stairs to the new floor, sound insulation to the rooms below and, above all, escape from fire. On a typical two-storey house, a loft conversion usually means fire-resisting doors onto the stairway and sometimes new partitions to protect it, because escaping through windows above the first floor is too dangerous. Mains-powered, interlinked smoke alarms are needed in the stairway at each level.

Loft work may also involve the Party Wall etc. Act 1996, for example when steel beams are set into a wall shared with the neighbour, and bats in the roof, which are a protected species and may need a survey. In Scotland, a building warrant is needed before work starts.

Source: planningportal.co.uk

What to include in your request

  • the type of work: partition, ceiling, acoustic upgrade, loft conversion
  • house, flat or commercial premises, and whether you own or lease it
  • approximate room sizes and ceiling heights
  • for a loft: the house type, roof shape, and whether you want dormers or roof windows
  • whether you already have drawings, structural calculations or Building Control approval
  • whether the finish should be skimmed, taped and jointed, or ready for decoration
  • for businesses: working hours, landlord approvals and site rules

How the request is passed on

Once your phone number and email address are confirmed, partitioning and loft businesses in your area can see the job without your name or contact details. Exactly one can buy it; the request then leaves the list and nobody else is offered it. The business pays Offrano, and you are not charged.

We email you the business's name, address and phone number before it sees your details. There is no guarantee that a business will take the request, and unsold requests are withdrawn after 21 days. Offrano checks only that buyers are registered businesses. For a loft conversion, ask who prepares drawings and calculations and which Building Control body will sign off the work.

Services

Related services

Frequently asked questions

Do I need Building Regulations approval for a stud wall?

A simple partition in a house often does not need approval on its own, but it can affect escape routes, ventilation or the fire safety of a loft room, and removing a load-bearing wall always needs approval. If in doubt, ask your local Building Control before work starts.

Does my loft conversion need planning permission?

In England many do not, if the conversion stays within the permitted development limits, including the volume allowance and the rules on height, dormers, materials and side windows. Flats, maisonettes and houses on designated land such as conservation areas need an application.

What fire safety work does a loft conversion need?

Usually a protected escape route: fire-resisting doors onto the stairway, sometimes new partitions, and mains-powered interlinked smoke alarms at each level. Parts of the existing floors may need upgrading. Building Control checks this as part of the approval.

Will a partition wall stop noise?

A standard stud wall with a single layer of board on each side offers limited sound insulation. Acoustic insulation in the cavity, heavier or extra boards and careful sealing at edges and sockets make a large difference. Ask for the system and its sound rating.

Do I need a party wall agreement for a loft conversion?

If the work involves cutting into or building on a wall you share with a neighbour, such as inserting beams into it, the Party Wall etc. Act 1996 is likely to apply and you must serve notice on your neighbour before work starts.

How many businesses receive my request?

One. The request goes to a single business and then comes off our list. You can still speak to other contractors independently.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides