Skip to content
Offrano
Choose country and language:

House building

Prefab houses: timber frame, panels and modules

One local tradesperson gets your request – no ring-round.

Your request: House building

Step 1 of 5 · Project

Project

What exactly is it about? (required)
Is there a plot of land? (required)
Is there planning permission? (required)
What type of house is planned? (required)
m²
Should the house have a basement? (required)
Desired level of completion (required)
When should the work start? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

A prefabricated house is made largely in a factory and assembled on the plot. The shell can be weathertight within days or weeks instead of months, and the factory controls quality in a way a muddy site cannot. The price for that is a design that has to be fixed early and a site that must be ready to the millimetre. Describe your project once; suppliers and builders near you see the request, and exactly one company can buy it.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

What prefab means in practice

Timber frame kits range from open panels, where the factory delivers wall frames and the insulation and boards are added on site, to closed panels that arrive insulated, lined and sometimes with windows fitted. Structural insulated panels (SIPs) are sandwich panels of insulation between boards and form walls and roofs together. Volumetric modular homes arrive as finished boxes, complete with kitchens and bathrooms, and are craned onto the foundations.

The more work done in the factory, the shorter the time on site and the earlier every decision has to be made. Some companies supply only the structural kit; others offer a package up to a weathertight shell, or a finished house through their own or partner builders. Be clear which one you are being quoted for.

Design freeze and factory slots

Factory production needs final drawings. Once the design is frozen, moving a window, a wall or a socket may mean a new panel or a charge for the change. Planning permission, structural calculations and Building Regulations approval should be in place, or at least well advanced, before the design is frozen.

Manufacturers usually take a deposit to reserve a production slot. Ask what happens to that deposit if the manufacturer stops trading, whether it is protected, and at which stages further payments fall due. Paying for panels that are sitting in a factory rather than on your plot is a risk you should understand.

Make a request

Foundations and the delivery day

A factory frame is precise, so the foundations must be too. They are usually built by a groundworker working to the manufacturer's tolerances, and a slab or wall that is out of level or out of square causes delays and extra cost on the day of erection. Agree who checks the foundations before delivery and who pays if they are wrong.

Large panels and modules arrive on long lorries and are lifted by crane. Narrow lanes, low bridges, overhead cables, trees and parked cars can all block delivery. Road closures or crane positions may need permission from the council. A manufacturer should survey the access before confirming the price.

Rules, warranty and the mortgage

Prefab houses need the same planning permission and Building Regulations approval as any other new home. The manufacturer's design and certification help, but Building Control still inspects the foundations, drainage and the completed house. Fire stopping between panels and floors, and moisture control in timber walls, are details to ask about.

Mortgage lenders and warranty providers are used to timber frame, but some treat other factory systems as non-standard construction. Before committing, ask the manufacturer which structural warranties and lenders have accepted its homes, and check with your lender or broker. Self-build mortgages that release money in stages need stages that match the factory's payment plan.

The quote in detail

  • exact scope: kit only, weathertight shell, or finished house
  • wall, floor and roof build-ups, and the thermal and airtightness targets
  • design freeze date and the cost of later changes
  • deposit, payment stages and how deposits are protected
  • foundation tolerances, who builds them and who checks them
  • delivery, crane, access survey and any road closures
  • warranty provider, lender acceptance and the certificates you will receive

How the request reaches a single company

We show your project, without your personal details, to prefab manufacturers and builders who cover your area. One company can buy it and pays Offrano for it; you pay nothing. Before it sees your name and number, we email you its name, address and phone number.

No company has to take the request, and after 21 days without a buyer it is withdrawn. You are free to say no to the quote. Offrano checks only that buyers are registered businesses, so visit completed homes and speak to their owners before you sign.

Services

Related services

Guides on House building

Frequently asked questions

Is a prefab house quicker to build?

The shell usually goes up much faster once the factory has made it, and it is weathertight sooner. Design, approvals, factory lead times and foundations still take time, so the overall project is not always as short as the erection period suggests.

Can I get a mortgage on a prefab home?

Usually, especially for timber frame, but some lenders treat other systems as non-standard construction. Check with your lender or broker which systems and warranties it accepts before you commit to a manufacturer.

Do prefab houses need planning permission?

Yes. A new house needs planning permission and Building Regulations approval however it is built. Factory construction does not change the planning rules.

What happens if my foundations are not accurate enough?

The panels or modules may not fit, and the erection can be delayed while the foundations are corrected, often with extra costs for crane and crew. Agree the tolerances and who checks them before delivery.

Will several manufacturers contact me?

No. Exactly one company can buy your request, and we tell you by email who it is before it receives your details.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides