House building
Building a masonry house: brick, block and the cavity between
One local tradesperson gets your request – no ring-round.
✓ Confirm
Almost done: please confirm your email address.
We have sent an email to {email}. We only release your request to businesses once you have clicked the link in it.
Most new houses in England and Wales are still built the traditional way: an inner leaf of blockwork, a cavity with insulation, and an outer leaf of brick, block with render, or stone. Builders, lenders, surveyors and buyers all know it well. The quality depends on details that disappear behind plaster within weeks. Describe your plot and plans once; the request goes to builders near you, and exactly one builder can take it.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
What a masonry wall is made of
The inner leaf carries floors and roof, and is usually built from concrete blocks. Aerated blocks are lighter and insulate better; dense blocks are stronger and heavier and hold heat and sound. The engineer's design and the thermal calculation decide which is used where. The outer leaf protects the wall from the weather and gives the house its appearance. Wall ties join the two leaves across the cavity.
The cavity itself is where the insulation goes, either filling it completely or partly with a clear gap kept open to the outer leaf. Either way, the insulation must be continuous, tight against the inner leaf, and kept clean of mortar droppings, which bridge the cavity and let damp and cold through. It is the kind of detail a warranty inspector or Building Control officer looks for, but only at the moments they are on site.
Openings, junctions and the details that fail
Most problems in masonry houses happen at the edges: above windows and doors where lintels, cavity trays and weep holes must direct water out; around frames where the cavity is closed; at the junction with the ground, where the damp-proof course and the floor's damp-proof membrane must meet; and at the eaves and gables where the wall meets the roof. These are also the places where heat escapes through thermal bridges.
Ask your builder how each of these junctions is detailed, and whether the drawings show them. Photographs of each stage before it is covered cost nothing and are valuable later, both for sign-off and if a leak ever needs tracing.
Make a requestWet trades, weather and time
Masonry is built with mortar, and much of the inside is often finished with wet plaster and a floor screed. All of that needs time and suitable weather. Bricklaying stops in frost and heavy rain, fresh work has to be covered, and a new house releases a lot of moisture as it dries out during its first months.
For you this means a longer programme on site than a factory-built house of the same size, and the need for protection of the work in winter. The benefit is that the design can change later in the process, openings can be adjusted on site, and local builders with masonry gangs are available almost everywhere.
Airtightness and appearance
Blockwork on its own is not airtight. The air barrier is usually wet plaster or a parge coat on the inner leaf, plus careful sealing around joists, pipes and cables. A house that fails its airtightness test at the end has to be investigated and fixed with the finishes already on, so it pays to check the barrier before plasterboard or kitchen units cover it.
The outer leaf is what planners care about. Planning permissions often include conditions about external materials, and the council may want to approve brick or stone samples before building starts. Leave time for that, and do not let the builder order bricks until the condition is discharged.
What to ask the builder
- block types for each wall, and the outer leaf material
- cavity insulation type, full or partial fill, and how it is kept clean
- lintel, cavity tray and cavity closer details at openings
- the air barrier strategy and when airtightness is tested
- how work is protected in winter, and drying-out time in the programme
- who arranges Building Control and warranty inspections at each stage
Your request and the one builder who can buy it
Tell us about the plot, the planning status and the house you want. Builders who work in your area see this summary without your contact details. One builder, and no more, can buy it; it pays Offrano, and the service costs you nothing. Before that builder sees your details, we email you its name, address and phone number.
If no builder buys the request within 21 days, it is withdrawn, and you are never obliged to accept a quote. Offrano checks only that the buyer is a registered business, so ask to visit houses it has built and check its warranty provider registration.
Related services
Guides on House building
Frequently asked questions
Is masonry better than timber frame for a new house?
Neither is better in every case. Masonry is familiar to builders, lenders and buyers, adapts easily on site and gives thermal mass. Timber frame and other factory systems are quicker to make weathertight and depend less on the weather. Cost, programme and your plot usually decide.
How long does a brick and block house take to build?
It depends on size, complexity, weather and how well the trades are organised. Masonry and wet plaster need drying time, so the programme is typically longer than for a factory-built shell. Ask the builder for a programme with key stages rather than a single figure.
What is a cavity tray?
A shaped damp-proof barrier built into the cavity above openings and at junctions. It catches water that runs down the inside of the outer leaf and directs it out through weep holes, so it does not reach the inner wall or the window head.
Why do planners want to see brick samples?
Planning permissions often include a condition that external materials must be approved before use, so the new house suits its surroundings. Building with unapproved bricks can breach the condition and lead to enforcement.
Will several builders get my contact details?
No. Only the builder that buys the request receives them, and only after we have emailed you its name, address and phone number.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request