Paving a driveway, patio or path: what lies beneath in Malta
One local tradesperson gets your request – no ring-round.
✓ Confirm
Almost done: please confirm your email address.
We have sent an email to {email}. We only release your request to businesses once you have clicked the link in it.
Paving fails from below. Sunken blocks, puddles against the house and cracked slabs almost always come from a thin or badly compacted sub-base or from water with nowhere to go. Tell us about the area once and the request goes to one paving firm in your area.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
Surfaces and how they differ
Concrete block paving is the common choice for driveways: individual blocks on a sand bed over a compacted sub-base, which can be lifted and relaid if a service trench is needed. Permeable block paving uses wider joints and an open-graded sub-base so rain soaks through. Resin-bound surfacing is a mix of aggregate and resin laid smooth; when laid on a suitable permeable base it drains through, while resin-bonded surfaces, with stones scattered on a resin coat, do not.
Tarmac and concrete are hard-wearing but impermeable unless a porous version is specified. Gravel is cheap and drains well, but moves under car tyres unless held in a grid. For patios and paths, natural stone such as sandstone, limestone, slate or granite, and porcelain slabs are popular. Porcelain is dense and stain-resistant but needs a specific priming slurry and careful laying; natural stone varies in thickness and needs a laying method to suit.
Dropped kerbs and access to the road
If you will drive across a pavement to reach the new driveway, you need a dropped kerb, and it is illegal to drive over the pavement without one. Apply before you commission the driveway: a refusal leaves you with a parking area you cannot legally use.
Make a requestWhat the quote should specify
Most arguments about paving come from what was not written down. The depth and type of sub-base, the edging and the falls are what make a driveway last; the visible surface is the easy part. Ask the contractor to state them. Where excavation will expose drains, inspection chambers or cables, the quote should say how they will be dealt with, and whether chamber covers will be raised to the new level.
- the area in square metres and the surface product by name
- excavation depth, sub-base material and compacted thickness
- edging or kerbs, and how the edges are restrained
- falls away from the house and where the water goes
- drainage channels, soakaways or planted areas, if any
- damp-proof course clearance next to the house
Common mistakes
Raising the ground level against the house is one of the most damaging. Paving should finish well below the damp-proof course, never level with it, and fall away from the walls, not towards them. Covering air bricks cuts off ventilation to suspended timber floors.
Very low prices sometimes mean block paving laid straight on soil or on a thin layer of sand, with no proper sub-base. It looks the same on the day it is finished and fails within a few winters. Pressure to decide on the doorstep, or a request for full payment in cash before any work, are warning signs too.
In Malta: permits, licences and the business behind the quote
Whether the garden project needs a development permit from the Planning Authority depends on what is built and where; in apartment blocks, the rules of the condominium also apply. Ask before you commit, and let the business tell you which documents it needs from you.
Electrical installation work is carried out by licensed electricians; ask to see the licence and the certificate for the finished installation. Maltese businesses are registered with the Malta Business Registry, so ask for the company registration and VAT numbers, and check whether the quote includes VAT.
Source: mbr.mt
What happens to your request
You confirm your mobile number with a text code and your email address with a link. We then show the request to businesses in your area, without your name or contact details. Only one business can take it on; it pays Offrano for the request, and it costs you nothing.
Before that business sees your details, we email you its name, address and phone number. We check only that it is a registered business, for example through its Malta Business Registry entry or VAT number, not the quality of its work. We cannot promise that a business will respond; if nobody takes the request within 21 days, we withdraw it. Offrano is not a party to any contract for the work.
Frequently asked questions
Is resin driveway permeable?
Resin-bound surfaces can be permeable when laid on a suitable permeable base. Resin-bonded surfaces, where loose stones are scattered onto a resin layer, are not. Ask the installer which system it uses and what base it will be laid on.
Do I need a dropped kerb?
Yes, if you drive over a pavement or verge to reach your driveway.
How deep should a driveway sub-base be?
It depends on the ground, the surface and whether cars or heavier vehicles will use it. A driveway needs a deeper sub-base than a garden path. Ask each contractor to state the depth and material in the quote, so you know what you are paying for.
How do I check a business in Malta?
Ask for its company registration number, which you can check with the Malta Business Registry, and its VAT number.
Source: mbr.mt
Can I withdraw my request?
Yes, through the link in any email from Offrano. If a business has already taken it on, we pass your withdrawal to it straight away.
What does the request cost me?
Nothing. The business that takes on your request pays Offrano for it. Whether you accept its quote is entirely up to you.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request