Skip to content
Offrano
Choose country and language:

EV charger installation

Installing a home EV charge point

One local tradesperson gets your request – no ring-round.

Guide price according to gov.uk: The OZEV chargepoint grant for renters and flat owners provides up to £500 towards the cost of installing a chargepoint, for applications …

Your request: EV charger installation

Step 1 of 5 · Project

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
Where will you charge? (required)
items
Desired charging power (required)
m
When should the work start? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

A standard home charger installation takes most of a day, but the decisions that make it work are taken before anyone drills a hole: where the charger goes, how the cable reaches it, whether your supply can carry the load, and how the charger is protected against earth faults outdoors. This page walks through those choices for a house, flat or rented home. When you send a request, one installer in your area can take it.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

Choosing the charger

A tethered charger has its cable permanently attached, so you just unhook it and plug in. An untethered charger has a socket; you use the cable that came with the car, which suits households with more than one car or those who expect to change cars. Tethered units are quicker to use every day; untethered ones look tidier on a front wall.

Most home chargers in Britain run from a single-phase supply and deliver around 7kW, enough to fill a typical car overnight. Every charger sold for home use in Great Britain must meet the smart charge point regulations, so the real differences lie in the app, tariff integration, solar features, build quality and how the charger handles load management. Check that the model works with the tariff you intend to use.

Source: planningportal.co.uk

Position, cable route and earthing

The charger should sit where the cable reaches the car's charging port without stretching across a path or door. The installer then plans the route from your consumer unit: through walls, along the outside, through a garage or under a drive. A long run or a route through finished rooms or under paving is what makes one installation cost far more than another.

Outdoor charge points need protection against a rare but dangerous fault on the supply network that can make the car body live. Many UK homes have a supply type where this matters, and the wiring regulations set out how to deal with it. Installers use a charger with built-in detection, a separate protective device or, occasionally, an earth electrode. The quote should say which method is used.

Make a request

Can your supply take it?

A 7kW charger running for hours is a large load on top of an electric shower, oven or heat pump. The installer looks at the rating of your main fuse, the size of the supply cable and what else runs at the same time. Load management, where the charger measures the household demand and slows down when it rises, often avoids an upgrade.

The network operator has to be told about the charge point. Depending on your supply and the charger, the installer either fits it and notifies the operator within 28 days, or applies first and waits for approval. If the operator needs to upgrade the main fuse or cable, that is arranged with it and can take time. As the owner, you should make sure the notification has been made.

The new circuit is notifiable electrical work in England and Wales. An electrician registered with a competent person scheme self-certifies it; you then receive the electrical installation certificate and, later, a Building Regulations compliance certificate.

Source: gov.uk · planningportal.co.uk

The OZEV grant for flats and renters

If you own and live in a flat, or rent any home, and have private off-street parking, the government's chargepoint grant can reduce the price. You apply to OZEV, and the charger must not be installed before OZEV confirms eligibility. The installer must be OZEV-authorised and the charger an eligible model. Renters need written permission from the landlord, and flat owners from the freeholder or managing agent. Owner-occupiers of houses cannot apply.

What the installer needs from you

  • photos of the meter, the main fuse and the consumer unit with its cover on
  • the planned parking position and where the car's charging port is
  • the distance and route from the consumer unit to the charger position
  • other large loads: electric shower, heat pump, solar panels or battery
  • for grant jobs: tenancy or leasehold details and the landlord's or freeholder's consent
  • the tariff or app you want to use

Your request goes to one business

Enter the details, confirm your phone number with a text code and your email with a link. Charger installers in your area see the job without your name or contact details. One of them can buy it, and it then comes off the list. The installer pays Offrano; you are not charged.

Before the installer gets your details, we email you its name, address and phone number. We cannot promise that an installer buys every request; after 21 days without a buyer it is withdrawn. Offrano checks registration as a business, not the quality of work, so check the electrician's competent person scheme registration and, for grant jobs, OZEV authorisation.

What does it cost?

  • The OZEV chargepoint grant for renters and flat owners provides up to £500 towards the cost of installing a chargepoint, for applications from 1 April 2026 until the scheme ends on 31 March 2027.

    Source: www.gov.uk

  • Make a request

Services

Related services

Frequently asked questions

Tethered or untethered: which is better?

Tethered is quicker day to day because the cable is always there. Untethered is more flexible if you have several cars or will change car, and looks neater. Neither charges faster; the charging speed depends on the charger rating and the car.

Can I just use a normal three-pin socket?

The portable cable supplied with many cars is meant for occasional use and charges slowly. Regular overnight charging from a household socket, especially through an extension lead, risks overheating. A dedicated charger on its own circuit is the safer routine option.

Who notifies the network operator?

The installer does, either within 28 days after installation or by applying before installation, depending on the supply and charger. As the owner, you are responsible for making sure it has happened.

Source: gov.uk

Can I get a grant if I rent my home?

Yes, if you have private off-street parking and your landlord agrees in writing. The OZEV grant for renters and flat owners runs until 31 March 2027. You must wait for OZEV to confirm eligibility before the charger is installed.

Source: gov.uk

Why does one installation cost more than another?

Mainly because of the cable route and the supply. A charger on the outside wall next to the consumer unit is simple. A long run under a drive, through finished rooms or to a detached garage, or a supply upgrade, adds labour and materials.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides