A complete renovation takes a dated or neglected house and brings every part of it up to date: roof and structure where needed, wiring, plumbing and heating, kitchen, bathrooms and finishes. The work itself is familiar to any good builder. What decides whether it goes well is how it is organised and paid for. Describe the property and what you want; the request is offered to renovation firms nearby, and exactly one firm can take it.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
Three ways to organise the job
With a main contractor, one builder prices the whole scope, employs or subcontracts the trades and is responsible for the result. You deal with one business and one contract. It usually costs more than hiring trades directly, because the builder carries the coordination and the risk of trades not turning up.
Managing the trades yourself can save money, but you then plan the sequence, order materials, arrange Building Control inspections and absorb every delay. Under the Construction (Design and Management) Regulations 2015, the HSE explains that a domestic client's duties normally pass to the contractor, or to the principal contractor where there is more than one; if you have not appointed one, they fall on the contractor in control of the work. When several trades work independently, it should be clear who that is.
With an architect or surveyor leading, the designer writes the specification, obtains approvals, and may administer the building contract, checking work and valuations before you pay. That adds fees but brings an independent eye, which is useful on large or complicated houses.
Source: legislation.gov.uk
A schedule of works, not a wish list
Builders can only price what they are told. A schedule of works lists each room and each element with the work required: remove and dispose, repair, replace, supply and fit. It names products or a standard, such as the type of flooring or the sanitaryware range, or includes a provisional sum where you have not yet chosen. Without it, two builders will price two different houses.
Provisional sums are honest placeholders, but a quote full of them is only an estimate. Try to fix the choices that drive cost before you sign: kitchen, bathrooms, flooring, windows and the heating system.
Make a requestLiving in or moving out
Living in a house while it is completely renovated is possible, but it slows the work and it is hard on the people living there: no heating for days, no kitchen for weeks, dust everywhere. Builders often price a vacant house lower because they can work in any room at any time. If you stay, agree which rooms stay usable, where the temporary kitchen goes and when water and power will be off.
Tell your home insurer before work starts. Policies often have conditions about major building work and about houses left unoccupied, and the builder should hold its own public liability and contract works insurance, which you can ask to see.
Variations and stage payments
Changes happen on every renovation: rot behind the plaster, a decision to move a doorway, a different tile. The contract should say that any variation is priced and agreed in writing before it is carried out. Keep a running list with the prices, so the final account holds no surprises.
Pay in stages linked to completed work, such as strip-out finished, first fix completed and inspected, plastering finished, rather than by the calendar. A modest deposit for materials is normal; paying most of the price before the work is done is not. Many contracts also hold back a small retention until snagging is complete.
- the schedule of works or drawings and specification the price is based on
- provisional sums, with what each covers
- programme with key dates and who applies to Building Control
- certificates to be handed over: electrical, gas, windows, Building Control
- stage payment plan, retention and how variations are agreed
- insurance, site protection, waste removal and working hours
Utilities and the long lead items
A complete renovation is the time to check the incoming supplies. Moving a gas meter, upgrading an electricity supply for a heat pump or car charger, or replacing a lead or shared water supply pipe all involve the network operator or water company, and their lead times can be longer than the builder's. Ask the builder early which applications are needed and who makes them.
Windows, kitchens and bespoke joinery also take weeks to manufacture. Order them on the builder's programme, not after the walls are plastered.
How one renovation firm gets your request
You describe the house and the scope once. We show the job to renovation firms in your area without your name or contact details, and one firm, and only one, can buy it. It pays Offrano, and you pay nothing. Before the firm sees your details, we email you its name, address and phone number.
A large renovation is a big commitment for a builder too, and there is no guarantee that a firm will take the request; if none does within 21 days, it is withdrawn. You are free to decline the quote and to approach other builders. Offrano checks only that the buyer is a registered business, so ask to visit a finished project and speak to the client.
Services
Guides on House renovation
- Asbestos before a renovationWhy older homes may contain asbestos, where it is found, what a survey is for, when licensed contractors are needed and your role as owner.Read more
- The Party Wall Act explainedWhen the Party Wall etc. Act 1996 applies in England and Wales, how and when to give notice, what happens if a neighbour does not reply, and awards.Read more
Frequently asked questions
Should I hire a main contractor or manage the trades myself?
A main contractor costs more but takes on coordination and risk, with one contract and one point of responsibility. Managing trades yourself saves money only if you have the time, knowledge and nerve to deal with delays, sequencing and Building Control.
What is a schedule of works?
A room-by-room list of every task and the standard of materials, used to get comparable prices and as part of the contract. It prevents the most common dispute on renovations: each side believing a different thing was included.
Can I live in the house during a complete renovation?
It is possible, but slower and harder. Expect periods without heating, water or a kitchen. Many people move out for the messiest phases, such as strip-out, first fix and plastering, and return for the finishing.
How should I pay a builder for a whole-house renovation?
In stages tied to completed and checked work, with a modest deposit for materials if needed. Agree variations in writing before they are done, and keep a small retention until snagging is finished.
Will more than one builder contact me?
No. Exactly one firm can buy your request, and we tell you by email who it is before it gets your details. You can still ask other builders yourself.