House renovation
Energy-efficiency renovation: a plan for the whole house
One local tradesperson gets your request – no ring-round.
✓ Confirm
Almost done: please confirm your email address.
We have sent an email to {email}. We only release your request to businesses once you have clicked the link in it.
An energy-efficiency renovation, often called a retrofit, aims to cut the heat a home loses and the energy it uses, in an order that makes each step pay for the next. Done piecemeal, one measure can undermine another: tight new windows without ventilation, or wall insulation that traps moisture. Describe your home and goals once; the request reaches retrofit and renovation businesses near you, and exactly one of them can take it.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
Start with a whole-house plan
The best retrofits begin with an assessment of the whole building: how it is built, where heat is lost, how damp and ventilation behave, how people use it, and what the EPC says. From that comes a sequence of measures, sometimes spread over years, so that each job prepares for the next. Insulation and airtightness usually come before a new heating system, because they reduce the size and running cost of whatever heats the house afterwards.
In the industry standard for retrofit, PAS 2035, which applies to work funded through schemes such as ECO4, a retrofit assessor surveys the home and a retrofit coordinator designs and oversees the measures. Even when you pay privately, asking for someone in those roles is a good way to get a plan rather than a sales pitch for a single product.
Source: knowledge.bsigroup.com
Fabric first, then ventilation, then heat
Loft insulation, cavity wall insulation and draught-proofing are the classic first steps where they are missing. Floors over ventilated voids, solid walls and windows follow, and are more expensive and more disruptive. Each of them changes how moisture moves in the house.
As a house becomes more airtight, ventilation has to be designed rather than left to chance. Extract fans in kitchens and bathrooms, trickle vents in windows, or a whole-house ventilation system keep humidity down. Skipping this is one of the most common causes of condensation and mould after a retrofit.
Only then is it time for the heating system: a heat pump sized on the new, lower heat loss, better controls, and possibly solar panels or a battery. A heat pump survey done before insulation work can oversize the system.
Make a requestSolid walls, older houses and planning
Most Victorian and Edwardian houses have solid walls rather than cavity walls. They can be insulated inside or out, but the materials and details must let the wall dry, or damp and decay follow. External wall insulation changes the look of the house, so while insulation normally needs no planning permission where the appearance does not change, external insulation may, and listed buildings and conservation areas need early contact with the council.
The government has consulted on reforming consumer protection for home upgrades after evidence of failings in ECO4 and the Great British Insulation Scheme. For you, that means asking pointed questions: who designed the detailing at windows, eaves and floors, who checks the work, and what happens if damp appears.
EPC targets and landlords
An EPC is often the yardstick, especially for landlords. In England and Wales, domestic private rented properties covered by the minimum energy efficiency standard cannot be let with a rating below E unless a valid exemption is registered. Owner-occupiers use the EPC to track improvement and for mortgage products linked to efficiency.
An EPC measures modelled running costs, not comfort or carbon exactly. A plan that aims only at a rating can choose measures that score well on paper but do little for a draughty house, so keep comfort, damp and bills in view as well.
Money: grants and VAT
The installation of energy-saving materials in homes, including insulation, draught stripping, heating controls, heat pumps, solar panels and batteries, is currently zero-rated for VAT, while windows and glazing are standard-rated. Lower-income households may qualify for ECO4, the Warm Homes: Local Grant in England, Home Energy Scotland in Scotland, or Nest in Wales. The Boiler Upgrade Scheme helps with heat pumps in England and Wales.
Grants have eligibility rules and installer requirements, and the order of measures sometimes follows the funding. Check before paying for any work you may later want funded.
- the assessment the plan is based on, and the EPC before and expected after
- measures in order, with reasons and the moisture strategy for each
- ventilation design alongside the insulation
- who designs details at windows, eaves, floors and junctions
- grants applied for, and what the installer must hold to claim them
- guarantees on insulation and how defects are handled
One business for your retrofit request
You send the request once. It is shown to retrofit and renovation businesses near you, without your name, number or email, and one business can buy it; it pays Offrano, not you. Before that business sees your details, we tell you by email who it is, with address and phone number.
No business is obliged to take the request, which is withdrawn after 21 days without a buyer, and you never have to accept a quote. Offrano checks that buyers are registered businesses, not their competence, so check TrustMark or scheme registration yourself if a grant is involved.
Services
Guides on House renovation
- Asbestos before a renovationWhy older homes may contain asbestos, where it is found, what a survey is for, when licensed contractors are needed and your role as owner.Read more
- The Party Wall Act explainedWhen the Party Wall etc. Act 1996 applies in England and Wales, how and when to give notice, what happens if a neighbour does not reply, and awards.Read more
Frequently asked questions
What should I do first to make my house more energy efficient?
Usually loft insulation, cavity wall insulation where suitable, and draught-proofing, planned together with ventilation. A whole-house assessment first avoids doing measures in an order that makes later ones harder or more expensive.
What is a retrofit coordinator?
Under the PAS 2035 retrofit standard, the retrofit coordinator plans the measures for a home, based on an assessment, and oversees their installation and evaluation. The role is part of work funded through schemes such as ECO4, and is useful for privately funded retrofits too.
Source: knowledge.bsigroup.com
Can insulation cause damp?
Yes, if it is the wrong material for the wall or is badly detailed, or if ventilation is not improved at the same time. Solid-walled older houses are the most sensitive. Ask the installer how moisture will leave the wall and the house.
What EPC rating does a rented home need?
In England and Wales, domestic private rented properties covered by the minimum energy efficiency standard must have a rating of at least E, unless a valid exemption is registered. Scotland has its own rules.
How many businesses will see my contact details?
Only one: the business that buys your request. We email you its name, address and phone number before it gets your details, and you can withdraw consent at any time.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request