Roof renovation: putting the whole roof right in one go

One local tradesperson gets your request – no ring-round.

Your request: Roofing

Step 1 of 5 · Project

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
Year the building was built (required)
Roof shape (required)
m²
Preferred roof covering (required)
When should the work start? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

A roof renovation goes further than a new covering. It deals with the structure, the insulation, the chimneys and the roofline in one planned job, usually because the roof has been patched for decades and nobody has looked at it as a whole. Send one request describing the house; it is offered to roofers in your area and exactly one of them can take it.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

How a renovation differs from a re-roof

A re-roof replaces what is on top of the rafters. A renovation also asks whether the rafters, purlins and wall plates are doing their job, whether the roof has spread and pushed the walls outwards, whether the loft is ventilated, and whether the insulation, fascias, soffits and guttering should be renewed at the same time. It is typically a job for houses that have not had serious roof work in living memory, for a house bought as a project, or before a loft is used for storage or living space.

The advantage is one scaffold, one programme and one set of details designed to work together. Ventilation at the eaves, the new underlay and the insulation, for example, have to suit each other, and they rarely do when they were installed by three different firms years apart.

Survey before scope

The roofer, and for older or altered roofs a structural engineer, should inspect the loft as well as the outside. Typical findings are purlins that have deflected, struts removed by a previous owner to make storage space, rafters notched for cables, water staining around chimneys and valleys, and signs of woodworm or rot at the wall plate. On a terrace, the state of the party wall in the loft and the fire-stopping above it matter too.

Ask for the findings in writing with photographs. That record lets you separate essential structural repairs from improvements you might choose, such as replacing plastic fascias or adding roof windows. It also lets Building Control or the competent person scheme see what was found and what was done.

Make a request

Structure, insulation and ventilation

Structural repairs to a roof need Building Regulations approval and should follow an engineer's design. Common work includes doubling up weak rafters, adding or restoring struts and binders, fixing roof spread with ties, and replacing rotten wall plates. Removing or cutting a structural timber without that design can cause movement and cracking in the walls below.

Because a renovation affects most of the roof, the insulation has to be improved where it is practical to do so. Two approaches are common. A cold roof keeps the insulation on the loft floor and ventilates the roof space above it. A warm roof places insulation along the slope, between and over or under the rafters, so the loft stays within the heated envelope. The right choice depends on what the loft is used for and on how the roof will breathe.

Spray foam applied to the underside of the roof deserves care. Government-commissioned research found moisture and timber decay risks in some combinations of foam, underlay and climate, with the highest risk where foam is sprayed directly onto the roof covering. If spray foam is already there, the renovation is often the moment to remove it and assess the timbers beneath.

Chimneys, roofline and the extras worth doing now

Chimney stacks can be repointed, rebuilt, capped or reduced while the scaffold stands. The same applies to lead flashings, parapet gutters, fascias, soffits and guttering. Replacing fascias and soffits does not normally need Building Regulations approval, but the roof ventilation at the eaves must not be reduced. In a house built or refurbished before 2000, old soffits and undercloaks can contain asbestos, which the HSE says should be identified before anyone cuts or breaks them.

Bats roost in older roofs. If there are signs of them, a bat survey comes first, and work may need a licence and a timetable that avoids sensitive seasons. Leaving this until the scaffold is up is expensive.

Source: hse.gov.uk

What the quote should show

A renovation quote is a package, so ask for it broken down. That lets you compare it with the separate costs of a re-roof and make decisions item by item.

  • the survey findings the price is based on, with photographs
  • structural repairs and who designed them
  • covering, underlay, battens and all flashings and details
  • insulation method, target standard and ventilation strategy
  • chimney, fascia, soffit and guttering work, listed separately
  • asbestos or bat surveys, if needed, and who arranges them
  • Building Control or competent person certification, scaffold duration and waste

How the request reaches one roofer

Describe the roof and what you already know about it. We show the job, without your personal details, to roofing businesses near you. Only one can buy it, and once it has, the request is gone from the list. You get an email with that business's name, address and phone number before it receives yours, and the service costs you nothing.

If no roofer takes it within 21 days, the request is withdrawn. You can turn down the quote and seek others. Offrano checks only that the buyer is a registered business, so look at completed roofs and check its scheme membership yourself.

Services

Towns and cities

Related services

Frequently asked questions

Is a roof renovation worth it compared with repairs?

If several parts of the roof are failing, a single renovation avoids paying for scaffolding and call-outs again and again, and the details are designed to work together. If the covering and timbers are sound and one area leaks, a repair is the better answer.

Do I need a structural engineer for a roof renovation?

For any work that changes or strengthens the roof structure, yes, or at least a design that Building Control accepts. For a straightforward re-covering on a sound structure, the roofer's own inspection is usually enough.

Should I remove spray foam insulation from my roof?

Not automatically, but it should be assessed. Research published by the government found higher moisture risks in certain set-ups, particularly foam sprayed straight onto the covering. Some lenders and surveyors also query it. A renovation is a practical time to inspect the timbers and decide.

Can I convert the loft at the same time?

A loft conversion is a different project with its own planning and Building Regulations requirements, including fire escape and floor strength. It can be planned alongside a roof renovation so that insulation and structure are done once, but it needs its own design.

How many roofers see my personal details?

One. The request is sold to a single roofer, and you are told who it is by email before your details are passed on. You can withdraw your consent at any time using the link in our emails.