Windows
Replacing the windows in an existing home
One local tradesperson gets your request – no ring-round.
✓ Confirm
Almost done: please confirm your email address.
We have sent an email to {email}. We only release your request to businesses once you have clicked the link in it.
Replacing windows is mostly decided before the fitters arrive: at the survey, where sizes, opening styles, escape routes and ventilation are settled, and in the contract, where your rights on made-to-measure frames are set. Tell us how many windows and what kind; the request goes to window companies nearby, and exactly one company can take it.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
The survey that fixes the order
Sales visits and surveys are not the same thing. The sales visit produces a price; the survey measures each opening precisely, checks the brickwork, the lintel above and the sill below, and confirms which way each window opens. Frames are made to those measurements, so mistakes at this stage are expensive to put right.
Use the survey to settle details that are hard to change later: which sashes open and which are fixed, the height of handles for children, restrictors on upstairs windows, obscure glass in bathrooms, and whether old sills are kept or replaced. If a window is being made smaller or larger, that is an alteration, not just a replacement, and may need a lintel or planning advice.
Escape windows and trickle vents
Upstairs, some windows are fire escape routes. The Planning Portal says a replacement must give at least the same potential for escape as the window it replaces. Where an escape window is needed, the guidance sets a clear openable area of at least 0.33 square metres, a minimum width and height of 450 millimetres, and the bottom of the opening no more than 1100 millimetres above the floor. Escape hinges on side-hung casements help achieve this.
Ventilation is the other easily lost detail. If the old windows had background ventilators, the new ones should not leave the room with less. Homes that go from draughty single glazing to tight double glazing without trickle vents or extract fans often develop condensation and mould within a winter, especially in bedrooms and bathrooms.
Make a requestFitting day and making good
Most houses are done a few windows at a time, so each room is open to the weather only briefly. The installer removes the old frame, fits the new one on packers so it sits square, fixes it into the reveals, seals the joint, and fits the internal trims or cills. Removing old frames can damage plaster; the quote should say whether making good means filling and trims, or plastering and redecoration.
Timber windows removed from an older house are sometimes set into lime mortar and the reveals can be fragile. In cavity walls, the gap between the frame and the cavity should be closed properly so heat and water do not track round the frame. Ask how the installer deals with both.
Contracts, cancellation and deposits
A contract signed at your home or at a distance generally carries a 14-day cancellation period for services, but the law excludes goods made to your specifications. Window contracts combine both, so read the cancellation clause before signing and ask when manufacturing starts. A company that pushes for a signature on the first visit with a discount that expires tonight is telling you something.
Keep deposits modest until the survey has confirmed sizes, and ask whether the deposit and the guarantee are insured if the company stops trading. Some competent person schemes offer insurance-backed guarantees; the company should say which applies.
Paperwork you should end up with
Replacement windows are controlled fittings. If the installer is registered with a competent person scheme such as FENSA or CERTASS, it notifies the work and GOV.UK says you should receive a certificate within 8 weeks of completion. If it is not registered, Building Control has to approve the work, and FENSA points out that it is the homeowner's responsibility to make sure the installation is registered, so agree in writing who applies and who pays the fee.
Ask also for the product details and energy rating of each window, the glazing specification, and the guarantee documents for frames, sealed units and installation.
- a window schedule: size, style, opening and glazing for each opening
- escape windows, restrictors, trickle vents and obscure glass marked
- removal of old frames, disposal and the extent of making good
- certificate route: competent person scheme or Building Control
- payment stages, deposit amount and deposit protection
- lead time and the number of fitting days
Source: gov.uk
How Offrano handles your window request
Window companies in your area see what you need, but not your name or contact details. The first company to buy the request is the only one that gets it, and it pays Offrano for it; you pay nothing. Before it sees your details, we email you its name, address and phone number.
We cannot promise that a company takes the request, and unsold requests are withdrawn after 21 days. You may turn the quote down. Offrano checks that buyers are registered businesses, not their installations, so look the company up on the FENSA or CERTASS register before signing.
Related services
Guides on Windows
Frequently asked questions
Can I cancel a window contract signed at home?
Contracts made at home generally carry a 14-day cancellation period, but goods made to your specifications are excluded from that right, and windows are made to measure. Read the contract's cancellation terms and ask when production starts before you sign.
Do the new windows have to be fire escape windows?
A replacement must be at least as good for escape as the window it replaces. If an upstairs room relies on that window as its escape route, the new window must meet the escape criteria, usually with escape hinges.
When do I get my FENSA or CERTASS certificate?
An installer in a competent person scheme notifies the work, and GOV.UK says you should receive the certificate within 8 weeks of completion. Chase it if it does not arrive, because a buyer's solicitor will ask for it when you sell.
Source: gov.uk
Why is there condensation on my new windows?
New windows are more airtight, so moisture that used to escape through gaps stays in the room. Open the trickle vents, use extractor fans in kitchens and bathrooms, and ask the installer whether ventilation was matched to the old windows.
Is it just one company that contacts me?
Yes. The request is sold to one window company only and then removed. We tell you who it is by email before it gets your details.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request