Skip to content
Offrano
Choose country and language:

Windows

Windows for a new house or extension

One local tradesperson gets your request – no ring-round.

Your request: Windows

Step 1 of 5 · Project

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
items
Preferred frame material (required)
Glazing (required)
When should the work start? (required)
Approximate budget (required)
Would you like to use grants or subsidies? (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

In a new building the windows are not a replacement for anything. They are part of the design that Building Control approves, the energy calculation the house was assessed on, and in England the overheating and security requirements for new homes. Tell us about the project and when the openings will be ready; the request goes to window suppliers and installers nearby, and exactly one company can buy it.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

Why new-build windows are different

Replacement windows in an existing home are usually signed off through a competent person scheme. That route does not apply here: FENSA, for example, states that it does not cover windows in new builds or new extensions. The windows are checked as part of the Building Regulations approval for the whole building, so the builder, the designer and the window company must work from the same specification.

That specification comes from the design stage. The energy assessment for a new dwelling, and the thermal calculations for an extension, assume particular window sizes and thermal performance. If cheaper windows with a worse rating are ordered later, the calculation no longer matches what was built, and sign-off can be delayed until it is redone.

Overheating and security in new homes

Approved Document O on overheating applies to new residential buildings in England. Large glazed areas facing south or west, and windows that cannot be opened wide enough for night-time ventilation, are the usual reasons a design fails it. The window company needs to know the opening areas the designer relied on, and whether restrictors, shading or specific glass were assumed.

Approved Document Q deals with security. Requirement Q1 applies only to new dwellings and asks for doors and windows that can resist physical attack by a burglar, being strong enough and fitted with appropriate hardware. Ask the supplier to confirm that the windows and doors it offers meet the standard referred to in the approved document, and keep the evidence for Building Control.

Wales, Scotland and Northern Ireland have their own building regulations and standards, so a supplier working across borders should check which version applies to your site.

Make a request

Timing on site

Windows are made to measure. Sizes are best confirmed on the built openings rather than from drawings, which means the supplier surveys once the walls are up, and lead times start from that point. On a timber frame or modular house, the openings are made in the factory and the windows can sometimes be fitted there too.

Windows often arrive when the building is not yet weathertight and other trades are still working. Agree who is responsible for protecting frames and glass from mortar, plaster and scaffolding damage, and who pays if a pane is cracked before handover.

Installation into the wall

How the window sits in the wall matters as much as the window itself. In a cavity wall, its position relative to the insulation affects cold bridging and the risk of condensation around the reveal. Cavity closers, damp-proof courses and cavity trays around the opening keep water out, and the gap between frame and wall should be sealed for airtightness, which is tested on new dwellings.

These details belong to the builder and the window installer together. Put the responsibilities in writing: who forms the openings, who fits the cavity closers and trays, and who seals the frame to the air barrier.

What the order should specify

  • window schedule matching the approved drawings and energy calculation
  • thermal performance for each unit, and glass specification
  • opening areas and restrictors assumed for overheating
  • security standard for accessible windows and doors
  • survey on built openings, lead time and delivery slot
  • installation, sealing, protection and responsibility for damage

Getting the request to one company

Describe your build, the number of openings and your timetable. Window companies in your area see that description without your contact details, and one of them can buy it. That company pays Offrano; you pay nothing. We send you its name, address and phone number before it can see who you are.

No company is obliged to take the request, which is withdrawn after 21 days without a buyer, and you remain free to decide. Offrano checks only that the buyer is a registered business. Ask for examples of new-build supply and for the evidence Building Control will need.

Services

Related services

Guides on Windows

Frequently asked questions

Do windows in a new build come with a FENSA certificate?

No. FENSA covers replacement windows in existing homes, not new builds or new extensions. New-build windows are approved as part of the Building Regulations approval for the whole building, and Building Control issues the completion certificate.

Can I change the windows from those on the approved plans?

Changes to size, position or appearance may need the planning authority's agreement, and changes to performance can affect the energy and overheating assessments. Check with your designer and Building Control before ordering something different.

What is Approved Document O?

It is the guidance on limiting overheating in new residential buildings in England. It affects the size and orientation of glazing and how much the windows can open, so the window specification has to follow the design that passed the assessment.

When should I order windows for a new build?

Choose the supplier and specification early, so it matches the approved design, but confirm sizes by surveying the built openings. Lead times for made-to-measure frames run from that survey, so plan it into the build programme.

Will my self-build request go to several window companies?

It is visible to several, but only one can buy it. As soon as one company has bought it, the request is removed, and we email you who that company is.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides