Skip to content
Offrano
Choose country and language:

Heat pump · Liverpool

Heat pumps in Liverpool: river heat for the centre, heat pumps for houses

One local tradesperson gets your request – no ring-round.

Your request: Heat pump

Step 1 of 5 · Project

Grants may apply – the business takes them into account in the quote.

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
Year the building was built (required)
m²
Current heating system (required)
How is heat distributed? (required)
When should the work start? (required)
Approximate budget (required)
Would you like to use grants or subsidies? (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

Liverpool's plans for low-carbon heat lean heavily on the River Mersey, the docks and waste water, feeding heat networks for the city centre and the south of the city. Most Liverpool homes, though, are terraced and semi-detached houses that will not be on a network any time soon. This page explains what the city's zoning work says and what that leaves for a heat pump. The request goes to a single installer.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

Liverpool

Region
North West
Population
508,961 (Source: ONS)

What the zoning report proposes

The Liverpool heat network zone opportunity report, published by the Department for Energy Security and Net Zero, identified 18 potential zones. Two are strategic: Liverpool City Centre and Speke/Garston. Networks already exist at Paddington Village, Liverpool Waters and the main universities and hospitals, all exploring how to decarbonise.

The heat sources named are distinctive: the River Mersey, the Sandon Dock wastewater treatment works and the docks. The council's net zero plan, as summarised in the report, aims to connect 70,000 buildings to heat networks by 2030. Like all the pilot reports, it warns that the figures are provisional.

Source: assets.publishing.service.gov.uk · gov.uk

Which homes are affected

Zoning can oblige some buildings in a zone to connect, but only three kinds have been proposed: new developments, large non-domestic premises and residential blocks already on communal heating. A terraced house in Anfield or Wavertree heated by its own boiler can move straight to a heat pump, and the Boiler Upgrade Scheme applies.

Flats are different. New flat developments in the city centre and at Liverpool Waters, and communally heated blocks, may already be connected or planned for connection. Ask the managing agent or developer.

Make a request

Terraces, alleys and outdoor units

Many Liverpool terraces have a small back yard opening onto an alley or entry. It can be a good place for an outdoor unit, provided there is space for airflow and servicing and the noise at the neighbours' windows, often only a few metres away, meets the MCS planning standard. Units must not block the alley or overhang it.

Under permitted development in England, a terraced house can have one outdoor unit, and in a conservation area it must not be on a wall or roof facing a road. Liverpool has conservation areas around its Georgian and Victorian neighbourhoods, so check your street before settling on a front position.

Inside, compact terraces often lost their airing cupboard when a combi boiler went in. A heat pump needs a hot water cylinder again, so the installer has to find room for it, sometimes in a bedroom cupboard or the loft space above the landing, with the pipework to reach it. Ask for the cylinder position to be agreed at the survey, not on installation day.

  • yard size and access for the unit and servicing
  • distance to neighbours' windows for the noise assessment
  • whether the house is in a conservation area
  • cylinder space inside a compact terrace
  • radiator changes after the heat loss calculation

Source: planningportal.co.uk

Your Liverpool request

The form asks whether you own the house and how it is heated today, because Boiler Upgrade Scheme eligibility depends on both. Merseyside installers see the job anonymously; the first to buy it is the only one who ever receives it, and our email names that firm, with address and phone number, before it can call you. You pay Offrano nothing.

Grants in the United Kingdom

These schemes may apply to your project. What counts are the provider's conditions at the time you apply.

  • Boiler Upgrade Scheme (BUS)

    UK Government (DESNZ), administered by Ofgem – England and Wales

    Grant towards replacing fossil fuel heating with a heat pump or biomass boiler in England and Wales: £7,500 for an air or ground source heat pump, £2,500 for an air-to-air heat pump and £5,000 for a biomass boiler. Until March 2027 an extra £1,500 is available for air or ground source heat pumps in homes heated by oil or LPG without mains gas; hybrid systems are not funded.

    Source: www.gov.uk · As of 09.2026

  • Warm Homes: Local Grant

    UK Government (DESNZ), umgesetzt durch Local Authorities (England)

    Energy performance upgrades and low-carbon heating for low-income households in privately owned homes in England, delivered by councils from April 2025 to March 2028. Eligible homes usually have household income of £36,000 a year or less and an EPC of D to G; measures can include wall, loft and underfloor insulation, air source heat pumps, smart controls and solar panels.

    Source: www.gov.uk · As of 09.2026

  • 0 % VAT on energy-saving materials (VAT Notice 708/6)

    HM Revenue & Customs

    The installation of energy-saving materials in homes – including insulation, draught stripping, heating controls, solar panels, air, ground and water source heat pumps and batteries – is zero-rated for VAT until 31 March 2027, after which the reduced rate of 5% applies. Windows and glazing are standard-rated.

    Source: www.gov.uk · As of 09.2026

Services

Towns and cities

Related services

Guides on Heat pump

Frequently asked questions

Will Liverpool connect my house to a heat network?

The zoning categories consulted on for required connection do not include individually heated houses. Networks are planned mainly for the city centre, Speke/Garston and large buildings.

Can a heat pump go in the back yard of a terrace?

Often, if there is room for airflow and servicing, it does not obstruct the alley, and the noise at neighbouring windows meets the MCS standard.

Is heat from the River Mersey available to homes?

It is named as a potential source for future heat networks. It is not something an individual household can connect to directly.

Do I need planning permission for a heat pump in Liverpool?

Usually not for one unit meeting the permitted development conditions. Listed buildings and road-facing walls in conservation areas are the main exceptions.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides