Heat pump
Heat pump new installation in a self-build or new home
One local tradesperson gets your request – no ring-round.
✓ Confirm
Almost done: please confirm your email address.
We have sent an email to {email}. We only release your request to businesses once you have clicked the link in it.
Putting a heat pump into a house that is still being built, or gutted back to the shell, is a different job from swapping out an old boiler. Nothing has to be worked around: the pipe runs, the floor build-up, the cylinder cupboard and the outdoor unit's position can all be designed for low-temperature heat from the start. This page covers what that means in practice, where the grant rules for new homes catch people out, and how to brief an installer. Your request goes to one installer only, not a list.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
When this is the right page
This service is for self-builds, custom builds, conversions of barns or commercial buildings into homes, large extensions with their own heating, and whole-house refurbishments where the heating, emitters and pipework are all being replaced. If you are replacing a working gas or oil boiler in a house you live in and keeping most of the radiators, the page on replacing old heating with a heat pump is the better fit.
The advantage of a new installation is timing. An installer brought in before the floor screed goes down can specify underfloor heating circuits at the right spacing, route the primary pipework the short way and leave a plant space big enough for the cylinder, buffer or expansion vessels and controls. Brought in after the plasterers, the same installer is working around decisions that were made without them.
Designing for low flow temperatures from day one
In England, Approved Document L says that a newly installed wet heating system, or one fully replaced including the appliance, emitters and pipework, should be sized so the whole system can heat the home at or below the maximum flow temperature the guidance sets. For a heat pump that is not a hurdle but the design target, and most installers aim lower still, because every degree less improves efficiency.
The same document asks for heat pumps to be sized from a proper heat loss calculation to meet the full heating load at the design condition, without relying on a built-in electric heater to make up the difference. On a new build that calculation uses the actual U-values and airtightness targets from your plans, so share the SAP calculation or energy statement with the installer as soon as you have it.
Underfloor heating is the natural partner on ground floors, especially under a screed. Upstairs, oversized radiators or low-temperature fan convectors are common. Room-by-room control is expected: thermostatic control in each heated room or zone, and weather compensation or internal temperature control on the heat pump itself.
- heat loss calculation based on the drawings and specified U-values
- emitter schedule: underfloor circuits, pipe spacing and radiator sizes per room
- design flow temperature and the expected seasonal performance
- plant room or cupboard layout: cylinder, controls, buffer if needed, service access
- outdoor unit position, condensate drainage and the planning check
- electrical supply and the network operator notification
Source: gov.uk
Make a requestGrants for new homes: read the conditions
The Boiler Upgrade Scheme in England and Wales is built around replacing fossil fuel heating, and most new build properties are not eligible. A new build that a developer is still building does not qualify. A self-build does qualify if you or the original owner built it, or paid a builder to build it, and it has never been owned by a business or organisation; your installer may ask for proof such as the title deeds. There is no biomass grant for self-builds.
Because the installer applies on your behalf and must install and commission within 120 days of the application, the timing on a building site matters. Talk to the installer about when to apply, so the grant does not lapse while you wait for the roof or the screed.
The zero rate of VAT for heat pumps applies to installations in residential accommodation. On a new dwelling, VAT on the construction work follows its own rules, which your builder and accountant should confirm.
Source: gov.uk
What is changing for new homes in England
The Future Homes and Buildings Standards are due to come into force in England, subject to transitional provisions. They require new homes to be built with low-carbon heating and add a requirement for on-site renewable electricity. A self-build that gets its building control approval before the change may be treated under the current rules; ask your building control body which version applies to your project.
Wales, Scotland and Northern Ireland set their own building standards. In Scotland, check the current building standards with your local authority's building standards service before designing the heating.
How the request reaches an installer
Describe the project stage, the size of the house and whether you have drawings or an energy statement. Once your phone number and email address are confirmed, the request is offered without your name or contact details to heat pump installers covering your area. The first installer to buy it is the only one who gets it; it pays Offrano, and you pay nothing.
We email you that installer's name, address and phone number before they see yours. There is no promise that an installer takes every request, and you are free to ask other installers as well. Offrano checks that buyers are registered businesses, not their design work, so look up the MCS certificate number yourself and ask for an example design from a similar build.
Grants in the United Kingdom
These schemes may apply to your project. What counts are the provider's conditions at the time you apply.
Boiler Upgrade Scheme (BUS)
UK Government (DESNZ), administered by Ofgem – England and Wales
Grant towards replacing fossil fuel heating with a heat pump or biomass boiler in England and Wales: £7,500 for an air or ground source heat pump, £2,500 for an air-to-air heat pump and £5,000 for a biomass boiler. Until March 2027 an extra £1,500 is available for air or ground source heat pumps in homes heated by oil or LPG without mains gas; hybrid systems are not funded.
Source: www.gov.uk · As of 09.2026
0 % VAT on energy-saving materials (VAT Notice 708/6)
HM Revenue & Customs
The installation of energy-saving materials in homes – including insulation, draught stripping, heating controls, solar panels, air, ground and water source heat pumps and batteries – is zero-rated for VAT until 31 March 2027, after which the reduced rate of 5% applies. Windows and glazing are standard-rated.
Source: www.gov.uk · As of 09.2026
Services
Towns and cities
Guides on Heat pump
Frequently asked questions
Can I get the Boiler Upgrade Scheme grant on a self-build?
Often, yes. A self-build is eligible if you or the original owner built it or paid a builder to, and it has never been owned by a business or organisation. Homes built by a developer are generally not eligible while they are being built.
When should the heat pump installer get involved in a new build?
Before the floor and the internal layout are fixed. The installer needs to plan underfloor circuits before screeding, a plant space for the cylinder and controls, and the route for pipes to the outdoor unit. Late involvement usually means compromises on pipe runs and emitter sizes.
Is underfloor heating necessary with a heat pump?
No, but it makes low flow temperatures easy to achieve on the ground floor. Well-sized radiators work too. The heat loss calculation decides which emitter goes where; the aim is a system that keeps every room warm at a low flow temperature.
Does a new home need a hot water cylinder with a heat pump?
In almost all cases, yes. Air-to-water heat pumps heat stored water rather than heating it on demand. The installer sizes the cylinder from the number of bathrooms and occupants, so plan a cupboard with room for it and for maintenance access.
How many installers will see my new build project?
They see only an anonymous summary. The project itself goes to just one installer, the one that buys it, and we tell you who that is by email before your details are passed on.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request