Solar panels · London
Solar panels in London: houses, blocks of flats and who has to agree
One local tradesperson gets your request – no ring-round.
Guide price according to gov.uk: Warm Homes: Local Grant allocations listed by the government (updated July 2026): Greater London Authority consortium £53,470,024; Barking …
✓ Confirm
Almost done: please confirm your email address.
We have sent an email to {email}. We only release your request to businesses once you have clicked the link in it.
In London the roof you want to use often is not yours alone. Many people live in flats, where the roof belongs to a freeholder, and many houses are in conservation areas. England's permitted development rules for solar have also just changed. This page sets out what that means in the capital, and where London households can look for funding. Your request goes to a single installer.
- Exactly one business. Your request is handed out once. After that, no other business sees it.
- You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
- Withdraw at any time. You can withdraw your consent at any time – using the link in our email.
London
- Region
- London
- Population
- 9,089,736 (Source: ONS)
The rules since 27 August 2026
The permitted development right for solar panels on houses and blocks of flats in England was updated on 27 August 2026. Until 27 August 2027, either the old or the new rules can be followed. Panels on a pitched roof should project no more than 200 mm from the slope; on a flat roof, the highest part must be no more than 600 mm above the highest part of the roof, and in protected areas a flat-roof installation needs prior approval from the borough.
In a conservation area, panels on a house must not be fitted to a wall, balcony or roof enclosure that fronts a highway; on a block of flats, not to a wall fronting a highway. Panels are not permitted development on a building within the grounds of a listed building.
Source: planningportal.co.uk
Blocks of flats and freeholders
A block of flats can have panels under permitted development, but planning is the smaller hurdle. The roof almost always belongs to the freeholder, and leases usually forbid alterations to the structure and exterior without consent. Panels for a single flat also raise questions about cabling through common parts and access for maintenance. In practice, solar on a London block is a project for the freeholder or the residents' management company, with each flat's share agreed in advance.
For converted houses split into two or three flats, the top-floor leaseholder may be the only one with easy access to the roof, but the lease still decides.
- who owns the roof: you, the freeholder or a management company
- consent under the lease, in writing, before ordering
- conservation area and listed building status in your borough
- flat roof in a protected area: prior approval needed
- scaffolding and pavement licences from the borough
Scaffolding on London streets
Most roof work in London needs scaffolding on or over the pavement, which needs a licence from the borough, and sometimes a parking bay suspension for deliveries. A local installer builds this into its programme and quote. Ask who applies and whether the fees are included.
Warm Homes funding through the GLA
In London, most boroughs take part in the Warm Homes: Local Grant through a consortium led by the Greater London Authority, which can fund measures including solar panels for low-income households in privately owned homes with an EPC of D to G. A few boroughs, such as Barking and Dagenham, received their own allocation. Check with your borough or the GLA whether you qualify. Separately, installing solar panels in a home is zero-rated for VAT at present.
Source: gov.uk
Your London request
Tell us whether it is a house or a flat, who owns the roof and your borough. We offer the request without your contact details to installers covering London. One installer can buy it, and before it receives your details we email you its name, address and phone number. The service costs you nothing.
What does it cost?
Warm Homes: Local Grant allocations listed by the government (updated July 2026): Greater London Authority consortium £53,470,024; Barking and Dagenham £2,644,879.
Source: www.gov.uk
- Make a request
Grants in the United Kingdom
These schemes may apply to your project. What counts are the provider's conditions at the time you apply.
Warm Homes: Local Grant
UK Government (DESNZ), umgesetzt durch Local Authorities (England)
Energy performance upgrades and low-carbon heating for low-income households in privately owned homes in England, delivered by councils from April 2025 to March 2028. Eligible homes usually have household income of £36,000 a year or less and an EPC of D to G; measures can include wall, loft and underfloor insulation, air source heat pumps, smart controls and solar panels.
Source: www.gov.uk · As of 09.2026
0 % VAT on energy-saving materials (VAT Notice 708/6)
HM Revenue & Customs
The installation of energy-saving materials in homes – including insulation, draught stripping, heating controls, solar panels, air, ground and water source heat pumps and batteries – is zero-rated for VAT until 31 March 2027, after which the reduced rate of 5% applies. Windows and glazing are standard-rated.
Source: www.gov.uk · As of 09.2026
Services
Guides on Solar panels
- Registering energy devices with the network operatorWhy solar panels, batteries, heat pumps and EV chargers must be registered with your network operator: 'connect and notify' or 'apply to connect'.Read more
- The Smart Export GuaranteeHow the Smart Export Guarantee works in Great Britain: who pays, what you need to qualify, why tariffs differ and why you can pick any licensee.Read more
Frequently asked questions
Can I put solar panels on my London flat?
Only with the freeholder's consent under the lease, even where planning allows it. Solar on a block works best as a project for the whole building.
Do I need planning permission in a London conservation area?
Not for panels that meet the permitted development conditions, which exclude walls, balconies and roof enclosures fronting a highway. Listed buildings and their grounds are excluded entirely.
Which rules apply after August 2026?
The updated permitted development right from 27 August 2026. Until 27 August 2027 you can follow either the old or the new version.
Source: legislation.gov.uk · planningportal.co.uk
Can I get a grant for solar panels in London?
Low-income households in privately owned homes with a low EPC may qualify for the Warm Homes: Local Grant, delivered in most boroughs through the GLA-led consortium.
Ready to make your request?
Describe your project – your request goes to exactly one business.
Make a request