Skip to content
Offrano
Choose country and language:

Solar panels

Extending an existing solar PV system

One local tradesperson gets your request – no ring-round.

Your request: Solar panels

Step 1 of 5 · Project

Grants may apply – the business takes them into account in the quote.

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
Roof shape (required)
Roof orientation (required)
m²
kWh
Would you like battery storage? (required)
When should the work start? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

Many households fitted a small system years ago and now use far more electricity: an electric car, a heat pump, people working from home. Adding panels sounds simple, but the existing inverter, the old panels, the network connection and any Feed-in Tariff contract all set limits. This page explains what decides whether an extension works, and when replacing the system is the better option. The request is passed to one installer near you.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

Three ways to add capacity

The first is to add panels to the existing inverter. That only works if the inverter has spare input capacity and a free input for a new string, and if the new panels are electrically compatible with the setting of that input. Panels made a decade ago differ from current ones in size, voltage and current, so new panels are rarely added to an old string.

The second is a separate system alongside the old one: new panels, usually on another roof slope, a garage or a garden frame, with their own inverter or microinverters. The two systems then run independently and are metered according to what your contracts require.

The third is replacement. If the original inverter is near the end of its life and the panels are small and dated, taking everything down and designing one new system can be simpler and, over the life of the system, not much dearer than an extension. A fair installer will price both options when the old equipment is marginal.

Feed-in Tariff and Smart Export Guarantee

If your original system earns Feed-in Tariff payments, be careful. The scheme closed to new applicants on 1 April 2019, and extensions to accredited installations commissioned on or after 15 January 2016 are not eligible for FIT payments. You must tell your FIT licensee when you add generating equipment, and the metering has to be arranged so that the FIT payments stay limited to the original installation. Ask the installer and the licensee how that will be done before you sign; mistakes here can put your existing payments at risk.

Under the Smart Export Guarantee, capacity can be added to an eligible installation, and your SEG contract requires you to tell the supplier about extensions as soon as reasonably possible. The new panels need their own MCS certificate if you want the export from them to count.

You cannot take FIT export payments and SEG payments for the same installation. An installer who works with extensions regularly will know how to handle this combination.

Source: gov.uk · ofgem.gov.uk

Make a request

The network connection

What the network operator looks at is the total capacity at your address, not just the new panels. An extension can move you from the simpler connect-and-notify route into one where the installer has to apply and wait for approval before installing. If capacity on your local network is tight, the operator may ask for an export limit. The quote should state the combined capacity and the route that applies.

Roof, planning and scaffolding

Additional panels on another slope are subject to the same permitted development conditions in England as the original ones, and the same restrictions in conservation areas and on listed buildings. A garden array at a house has its own limits, including a maximum panel area of 9 square metres. The roof structure has to carry the extra load, so the survey should cover it again rather than rely on the original installer's assessment.

Scaffolding is often a large part of the price of a small extension. Combining the job with other roof work, or with a battery fitted at the same visit, can make it better value.

What to give the installer

  • the original MCS certificate, inverter model and number and type of panels
  • Feed-in Tariff or Smart Export Guarantee contract details
  • your recent electricity use and any new loads such as an electric car
  • photos of the inverter label, the consumer unit and the meter
  • the roof slopes or outbuildings you are considering
  • whether a battery is planned now or later

How Offrano handles the request

Your description goes, without anything that identifies you, to solar installers in your area once you have confirmed your number with a text code and your email with a link. The first installer to buy it is the only one; the request is then taken off the shop, and the installer pays for it rather than you.

We send you the installer's name, address and phone number by email before it sees your details. If no installer buys within 21 days, the request is withdrawn, and there is never an obligation to accept a quote. We check that buyers are registered businesses, not their workmanship, so confirm the MCS certification on the MCS website.

Grants in the United Kingdom

These schemes may apply to your project. What counts are the provider's conditions at the time you apply.

  • Warm Homes: Local Grant

    UK Government (DESNZ), umgesetzt durch Local Authorities (England)

    Energy performance upgrades and low-carbon heating for low-income households in privately owned homes in England, delivered by councils from April 2025 to March 2028. Eligible homes usually have household income of £36,000 a year or less and an EPC of D to G; measures can include wall, loft and underfloor insulation, air source heat pumps, smart controls and solar panels.

    Source: www.gov.uk · As of 09.2026

  • 0 % VAT on energy-saving materials (VAT Notice 708/6)

    HM Revenue & Customs

    The installation of energy-saving materials in homes – including insulation, draught stripping, heating controls, solar panels, air, ground and water source heat pumps and batteries – is zero-rated for VAT until 31 March 2027, after which the reduced rate of 5% applies. Windows and glazing are standard-rated.

    Source: www.gov.uk · As of 09.2026

  • Nest (Warm Homes Nest scheme)

    Welsh Government

    Welsh Government scheme offering free advice to households in Wales and, for eligible households, free home energy improvements such as a heat pump, insulation or solar panels, and in some cases boiler repair or replacement.

    Source: www.gov.wales · As of 09.2026

Services

Towns and cities

Related services

Guides on Solar panels

Frequently asked questions

Will adding panels affect my Feed-in Tariff?

The extension itself will not earn FIT payments if it is commissioned on or after 15 January 2016, and you must tell your FIT licensee. Done properly, your existing payments continue for the original system. Done badly, with the wrong metering, they can be questioned.

Source: gov.uk · ofgem.gov.uk

Can I mix new panels with my old ones?

Rarely on the same string, because modern panels have different electrical characteristics. New panels usually go on a separate inverter input, a separate inverter or microinverters. The installer checks the data sheets of both.

Is it cheaper to extend or replace?

It depends on the age of the inverter and panels, the roof space and the scaffolding. If the inverter needs replacing soon anyway, a new single system may cost little more over its lifetime. Ask for both prices.

Do I need a new MCS certificate for the extension?

Yes, if you want the extension to count for export payments. The installer certifies the new part of the system and gives you the certificate and handover documents for it.

Do I need to tell the network operator about a few extra panels?

Yes. The operator looks at the total capacity of all generation and storage at your address, and an extension can change which notification route applies. Your installer handles the forms, but you should check that it has been done.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides