Skip to content
Offrano
Choose country and language:

Solar panels

A new solar PV system from scratch

One local tradesperson gets your request – no ring-round.

Guide price according to mcscertified.com: According to MCS, the average cost of installing a certified solar PV system on a home in 2025 was just over £7,000, based on its …

Your request: Solar panels

Step 1 of 5 · Project

Grants may apply – the business takes them into account in the quote.

Project

What exactly is it about? (required)
Do you own the property? (required)
What type of building is it? (required)
Roof shape (required)
Roof orientation (required)
m²
kWh
Would you like battery storage? (required)
When should the work start? (required)
Approximate budget (required)

At least 20 more characters

Where is the project?

Free · no obligation · only one business gets your number

This page is for households that have no solar panels yet and want a complete system: panels, inverter, wiring, the connection to the grid and the certificate that lets you earn money from exports. The decisions you make at this stage are hard to undo later, especially the inverter and whether the system is ready for a battery. Describe your house and roof once and the request goes to one installer who covers your postcode.

  • Exactly one business. Your request is handed out once. After that, no other business sees it.
  • You know who will be in touch. Before the business receives your contact details, we send you its name, address and phone number.
  • Withdraw at any time. You can withdraw your consent at any time – using the link in our email.

What a complete system consists of

The panels are the visible part, but the design choices sit elsewhere. Panels are wired together into strings and feed an inverter, which turns their direct current into the alternating current your home uses. From there a cable runs to your consumer unit, usually through an isolator and a generation meter, and the installer sets up monitoring so you can see what the system produces.

There are three common inverter layouts. A single string inverter is the simplest and usually costs least, and works well on an unshaded roof with all panels facing the same way. Optimisers fitted behind each panel let one shaded or differently angled panel work without dragging the others down. Microinverters convert power at each panel, which removes the central inverter but puts more electronics on the roof. A hybrid inverter can run a battery as well as the panels; if a battery is likely in the next few years, choosing one now can avoid replacing the inverter later.

On the roof, in the roof or in the garden

Most systems are mounted on rails above the existing tiles or slates. In-roof systems replace part of the roof covering with a flashing kit so the panels sit flush. They look neater and are often chosen on new builds or during re-roofing, but they involve more roofing work and the weatherproofing depends on the quality of that work.

Where the roof is too small, shaded or listed, a ground-mounted array in the garden or panels on a garage or outbuilding can be the alternative. In England, stand-alone panels at a house have their own permitted development limits, including a maximum panel area of 9 square metres and height limits that are lower close to the boundary. Larger garden arrays need a planning application.

If the roof covering will need replacing in the next few years, do that first. Removing and refitting panels later means a second round of scaffolding and a second visit from the installer.

Make a request

From survey to switch-on

A proper survey looks at the roof structure and fixings, the rafters, the condition of the covering, the route for cables, the position of the inverter and the state of your consumer unit. Some older fuse boards have no spare capacity or no suitable protection, and the installer may need to upgrade them before connecting a generator.

Your local network operator has to be told about the system. For smaller systems the installer connects first and notifies the operator within 28 days using the G98 process. Larger systems, and some combinations with other equipment, go through G99, where the installer applies before installing and waits for approval. The quote should say which route applies, because an application can move the start date.

After commissioning, an MCS-certified installer registers the installation and issues the MCS certificate. You need it, together with a meter that records exports half-hourly, to apply for a Smart Export Guarantee tariff with the supplier of your choice.

Source: gov.uk

When a new system is not the right step

Solar makes little sense on a heavily shaded roof, on a north-facing slope, or where you expect to move before the system has had time to earn back a good part of its cost. Leaseholders of flats usually need consent from the freeholder, and a tenant needs the landlord's agreement. In a listed building, consent is needed before anything goes on the roof. If you already have panels and simply want more output, extending the existing system is a separate job with different rules.

Points worth seeing in writing

  • the inverter type and whether it can run a battery later without replacement
  • on-roof or in-roof mounting, and who is responsible for the roof covering around the panels
  • where the inverter, isolators and generation meter will be installed
  • any consumer unit upgrade needed before connection
  • G98 notification or G99 application, and who submits it
  • monitoring set-up and access to the data
  • the MCS certificate and the Building Regulations compliance certificate for the electrical work

Your request and the installer who takes it

Once your phone number and email are confirmed, the job appears without your name or contact details to solar installers covering your area. Only one installer can buy it; after that it is gone from the list. The installer pays Offrano for the request, so you pay nothing, and before your details are passed on you get an email with the installer's name, address and phone number.

Nobody is obliged to buy a request, and one that is still unsold after 21 days is withdrawn. You can refuse the quote and ask other firms. Offrano checks that the buyer is a registered business, not how well it installs, so look up its MCS certification yourself before signing.

What does it cost?

  • According to MCS, the average cost of installing a certified solar PV system on a home in 2025 was just over £7,000, based on its installation data dashboard.

    Source: mcscertified.com

  • Make a request

Grants in the United Kingdom

These schemes may apply to your project. What counts are the provider's conditions at the time you apply.

  • Warm Homes: Local Grant

    UK Government (DESNZ), umgesetzt durch Local Authorities (England)

    Energy performance upgrades and low-carbon heating for low-income households in privately owned homes in England, delivered by councils from April 2025 to March 2028. Eligible homes usually have household income of £36,000 a year or less and an EPC of D to G; measures can include wall, loft and underfloor insulation, air source heat pumps, smart controls and solar panels.

    Source: www.gov.uk · As of 09.2026

  • 0 % VAT on energy-saving materials (VAT Notice 708/6)

    HM Revenue & Customs

    The installation of energy-saving materials in homes – including insulation, draught stripping, heating controls, solar panels, air, ground and water source heat pumps and batteries – is zero-rated for VAT until 31 March 2027, after which the reduced rate of 5% applies. Windows and glazing are standard-rated.

    Source: www.gov.uk · As of 09.2026

  • Nest (Warm Homes Nest scheme)

    Welsh Government

    Welsh Government scheme offering free advice to households in Wales and, for eligible households, free home energy improvements such as a heat pump, insulation or solar panels, and in some cases boiler repair or replacement.

    Source: www.gov.wales · As of 09.2026

Services

Towns and cities

Related services

Guides on Solar panels

Frequently asked questions

Should I choose a hybrid inverter even if I do not want a battery yet?

If a battery is a realistic plan within a few years, a hybrid inverter is usually the cheaper route overall, because the battery can be added without replacing the inverter. If you are sure you will never add one, a standard string inverter is simpler. Ask the installer to price both.

Are in-roof panels better than on-roof panels?

They look tidier and suit new roofs, but they replace part of the roof covering, so the flashing has to be fitted well to stay watertight. On an existing roof in good condition, on-roof mounting is the usual choice and easier to remove later.

Do I need to tell my electricity network operator?

Yes. Your installer notifies the network operator, either within 28 days of connection for smaller systems under G98 or before installation under G99 for larger ones. As the owner, you should make sure this has been done.

Source: gov.uk

Can I put solar panels in my garden instead of on the roof?

Yes. In England a stand-alone array at a house can be permitted development if it stays within the limits, including a panel area of no more than 9 square metres and height limits near the boundary. Anything larger needs planning permission.

What paperwork should I have after installation?

The MCS certificate, the electrical installation certificate, a Building Regulations compliance certificate, confirmation of the network notification, and the handover documents with warranties. Keep them together; you need them for export payments and when you sell the house.

Ready to make your request?

Describe your project – your request goes to exactly one business.

Make a request

Popular services

New in the guides