Building and renovation in Ireland: the rules and the order of works
A renovation starts with what is allowed and what is already in the house. Only then come the schedule and the price. Here is the overview for Ireland.
Paperwork you will want when you sell
Missing certificates can delay a sale or lead to indemnity policies. Ask at the quote stage who will provide which certificate, and keep them together.
Topics this section covers
- House building, self-build and extensions
- Whole-house renovation and period properties
- Roofing, re-roofing and flat roofs
- Windows, front doors, shutters and awnings
- Facade renovation, rendering and cladding
- Basement waterproofing and damp
- Demolition and strip-out
- Bathrooms, kitchens, tiling, flooring and plastering
- Accessible home adaptations and stairlifts
What a usable quote contains
A quote you can compare lists the scope item by item, the materials or products by name, what is excluded, who deals with approvals and waste, how long the price is valid, the payment stages and what happens if something unexpected turns up once work starts. A single lump sum with 'labour and materials' is hard to hold anyone to.
Be cautious about large deposits before any work or ordering, and about pressure to decide on the day. Staged payments tied to finished stages protect both sides.
Asking for a quote through Offrano
Each trade page has a short request form. Your request goes to exactly one business that works in that trade in your area and buys it; the service costs you nothing, and we email you the business's name, address and phone number before it sees your details. We cannot promise that a business takes up every request, and Offrano does not check the quality of anyone's work, so check registrations and ask for references yourself.
Planning, registration and VAT
Many small works on a house are exempted development within set limits; larger works and protected structures need planning permission from the county or city council. Electrical work is carried out by Registered Electrical Contractors and gas work by Registered Gas Installers. Ask whether quotes include VAT, which Revenue charges at rates that depend on the goods and services.
Frequently asked questions
Do I need planning permission for an extension?
Small extensions are often exempted development within set limits. Check with your council's planning office if in doubt.
Who can do the electrical work in my renovation?
A Registered Electrical Contractor. Ask to see the registration before work starts.
What does the request cost me?
Nothing. The business that takes on your request pays Offrano for it. Whether you accept its quote is entirely up to you.
Why does only one business get my request?
So that you are not called by several firms at once. The business that takes it on has the request to itself.